Any order plan scheduled in early October ?

Please note early Oct. our production team will have one week holiday for National Day.

Our production line is tight and fully arranged, so that if order in early Oct. lead time might postpone 2-3 weeks later.

It will be wiser if possible confirm order before end Sept. to have more chances reach better lead time.

Meanwhile, we have hot stock for Diode LL4148, M7, SMD 3mm trimmer capacitor now !

Please don’t hesitate to contact us, we’re willing to support !

Learn More:http://kingtronics.com/

We hereby sincerely invite you and your company representatives to visit our booth 5G-C26 at HK Convention and Exhibition Centre from October 13th~16th.

Kingtronics is ISO9001:2015 manufacturer for electronic components. All our products are RoHS compliant, Reach standard.
We are qualified to support your business with intimate service, reasonable prices and excellent quality products
 
It would be a great pleasure to meet both our regular and new customers at the exhibition.
We expect to establish long-term business relations or develop more business together with your company in future.
 
electronicAsia HK 2019
Convention and Exhibition Centre, HongKong
Date: 13-16 October, 2019
Booth No.: 5G-C26
 
Hot sell Products: 
1. Capacitors: Aluminum Electrolytic Capacitor(radial, axial, SMD, snap-in, lug, screw), Radial MLCC, tantalum capacitor (dipped & SMD), ceramic trimmer capacitor
2. Trimming Potentiometers: RKT-3006, RKT-3266, RKT-3296, RKT-3323, RKT-3329, RKT-3362, RKT-3386, RKT-3306, RKT-3309, RKT-3540S, RKT-3590, RKT-C3305, RKT-065…
3. Diodes & transistor: M7, LL4148, 1N4001-1N4007, 1N5391-1N5399, RL201-RL207, 6A05-6A10, FR101-FR107, BC807, BC817, BC846-BC850, BC856-BC859, MMBT3904…
4. Bridge: DB101-DB107, DB101S-DB107S, MB1S-MB10S, KBL4005-KBL410, KBU6005-KBU610, KBP2005-KBP210, GBU4005-GBU410, GBJ6005-GBJ610, KBPC25005W-KBPC2510W, KBPC35005-  KBPC3510…

Mid-Autumn Festival is an East Asian harvest festival, held on the 15th day of the 8th month of the lunar calendar with full moon at night.

 
Several official names are used as Mid-Autumn Festival, Tsukimi 月見 in Japan, Chuseok 추석 in Korea, Tết Trung Thu in Vietnam.
 
The festival celebrates three fundamental concepts that are closely connected--Gathering, Thanksgiving, Praying.
 
Kingtronics wishes you have a great reunion with family and friends as well as sincerely wish we could help u do more business. 
 
Now we provide good offer for EKT Low ESR Chip Tantalum Capacitors, let us know how we could help u cost down.
 

SERIES

DESCRIPTION

CAP. RANGE

VOLT. RANGE (DC)

TEMP. RANGE (°C)

EKT

Low ESR Chip Tantalum Capacitors

0.1 - 470µF

4V - 50V

-55 ~ +125

Datasheet: http://www.kingtronics.com/pdf/low-esr-chip-tantalum-capacitors.pdf

Silicon Epitaxial Planar Switching Diode is our hot selling product with fast switching speed.

These diodes are also available in other case style including the DO-35 case with type designation 1N4148, the Mini MELF case with the type designation LL4148 and the Micro MELF case with the type designation MCL4148.
 
Although they are for general applications, but there are slight difference feature as below:
 
Silicon Epitaxial Planar Switching Diode 1N4148W:
SOD-123 Package Silicon Epitaxial Planar Switching Diode
Silicon Epitaxial Planar Switching Diode 1N4148WS:
SOD-323 Package Silicon Epitaxial Planar Switching Diode 
Silicon Epitaxial Planar Switching Diode 1N4148WT
Ultra-small surface mount package, High conductance

Zener diodes are used for voltage regulation, as a Voltage Regulator or Stabilizer, as a Meter Protector and as a Wave Shaper. They can be found wide applications commercially and industrially. The load voltage equals breakdown voltage VZ of the diode. The series resistor limits the current through the diode and drops the excess voltage when the diode is conducting.

The common type Glass Case Silicon Planar Zener Diodes are used below: 

 A Zener Diode is a special type of rectifying diode that permits current to flow in the forward direction as normal, but will also allow it to flow in the reverse direction when the voltage is above a certain value – the breakdown voltage known as the Zener voltage.

 
Please see some of strong zener diodes products as following:
Zener Diodes BZV55C
Silicon Planar Power Zener Diodes BZX85C
Silicon Planar Power Zener Diodes 1N4727A-1N4761A
Silicon Planar Zener Diodes BZX84C

Below professional report indicates some popular brand’s competitiveness on lead time and price. It’s a guidance leading you to save more cost.

Price is cost, Time is cost, Service is cost… Among various famous brands, it’s obvious Kingtronics is the one who offers more economically.

Any requirements based on orders are negotiable, we are open to closer cooperation.

ALUMINUM ELECTROLYTIC CAPACITOR

MANUFACTURER

CURRENT LEAD-TIMES(weeks)

LEAD-TIMES TREND

CURRENT PRICING

NIC Components

16-25

Increasing

Increasing

Nichion

14-20

Decreasing

Increasing

Surge

16-18

Stable

Stable

Panasonic

14-18

Decreasing

Stable

United Chemicon

16-18

Increasing

Stable

Kingtronics

5-9

Stable

Descreased , Stable

 

 

 

 

CAPACITORS-TANTALUM

MANUFACTURER

CURRENT LEAD-TIMES(weeks)

LEAD-TIMES TREND

CURRENT PRICING

AVX

12-14

Decreasing

Stable

Vishay

11-13

Decreasing

Stable

Kingtronics

5-9 for Dipped type, 2-5 for SMD type

Stable

Descreased , Stable

 

 

 

 

LEADED CAPACITORS - CERAMIC

MANUFACTURER

CURRENT LEAD-TIMES(weeks)

LEAD-TIMES TREND

CURRENT PRICING

AVX

18-20

Stable

Stable

Murata

18-20

Stable

Stable

Vishay

12-16

Stable

Stable

NIC Components

14-18

Increasing

Increasing

TDK

14-20

Increasing

Increasing

Kingtronics

3-5

Stable

Descreased , Stable

 

 

 

 

SURFACE MOUNT GENERAL CAPACITORS - CERAMIC (Less than 1uf)

MANUFACTURER

CURRENT LEAD-TIMES(weeks)

LEAD-TIMES TREND

CURRENT PRICING

AVX

22+

Decreasing

Selective Market Adjustments

Murata

30+

Decreasing

Stable

Samsung

16+

Decreasing

Stable

TDK

40+

Decreasing

Stable

NIC Components

16+

Decreasing

Selective Market Adjustments

Taiyo Yuden

16

Decreasing

Stable

Yageo

16

Decreasing

Stable

Walsin

16

Decreasing

Stable

Vishay

20+

Stable

Stable

Kingtronics

4-6

Stable

Descreased , Stable

 

 

 

 

SURFACE MOUNT GENERAL CAPACITORS - CERAMIC (greater than 1uf)***Excludes 1206+ sizes

MANUFACTURER

CURRENT LEAD-TIMES(weeks)

LEAD-TIMES TREND

CURRENT PRICING

AVX

30+

Stable

Stable

Murata

22-38+

Stable

Stable

Samsung

30+

Stable

Stable

TDK

40+

Stable

Stable

NIC Components

24+

Stable

Stable

Taiyo Yuden

18+

Stable

Stable

Yageo

16

Stable

Stable

Walsin

40+

Stable

Stable

Kingtronics

4-6

Stable

Descreased , Stable

 

 

 

 

TRIMMERS & POTS

MANUFACTURER

CURRENT LEAD-TIMES(weeks)

LEAD-TIMES TREND

CURRENT PRICING

BI Tech

8-20

Stable

Stable

Piher

10-14

Stable

Stable

Panasonic

14-17

Increasing

Stable

Vishay

10-14

Stable

Stable

Kingtronics

5-7

Stable

Stable

 

 

 

 

Varistors

MANUFACTURER

CURRENT LEAD-TIMES(weeks)

LEAD-TIMES TREND

CURRENT PRICING

Littelfuse

8-10

Stable

Stable

AVX

14-16

Stable

Stable

Epcos

14-16

Stable

Stable

Maida

8-10

Stable

Stable

Kingtronics

5-7

Stable

Stable

ACTIVES

 

Technology

Manufacturer

Current Lead-Times

Lead-Times Trend

Comments

 
 

Rectifiers

Diodes Inc

12-24

Increasing

Schottky rectifiers SOT23 and SOD323 20- 24 weeks, PDI123 21 weeks, SBR TO220AB 12-20 weeks, SMA 16-18 weeks.

 

Vishay

16-52

Increasing

There are increased lead times in SMA, SMB, SMC, TO-220, TO-263 and DPAK. Schottkys are most affected with 40-52 weeks lead time.

 

ON Semiconductor

18-42

Increasing

SOD123 flat lead, SOT23 copper and SMA Flat lead 36-42 weeks lead time. Automotive parts 26-32 weeks

 

STMicroelectronics

20-33

Increasing

TURBO 2 Ultrafast High Voltage Rectifiers running about 20 weeks. Everything else is 25-33 weeks.

 

Fairchild

12-14

Stable

 

 

TVS Diodes

Diodes Inc

12-16

Increasing

 

 

Littelfuse

16

Increasing

Purchased ON Semi TVS business Lead times 24 weeks

 

Vishay

25-40

Increasing

SMC at 25 weeks SMA and SMB at 40

 

STMicroelectronics

8

Stable

 

 

Schottky Diodes

Diodes Inc

12-22

Increasing

 

 

Nexperia

20-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

ON Semiconductor

20-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Fairchild

16-45

Increasing

 

 

Switching Diodes

Diodes Inc

12-22

Increasing

 

 

Fairchild

16-45

Increasing

 

 

ON Semiconductor

16-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Nexperia

20-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

Zener Diodes

Diodes Inc

12-22

Increasing

 

 

Fairchild

10-30

Increasing

 

 

Nexperia

6-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

ON Semiconductor

12-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Vishay

12-44

Increasing

SMA SMB - 28-44 WEEKS

 

Bridge Rectifiers

Diodes Inc

16-30

Increasing

DFxx series 25-30 weeks, KBPxx series 21-25 weeks.

 

Fairchild

12-42

Increasing

 

 

Vishay

19-45

Increasing

 

 

General Purpose Transistors

Diodes Inc

12-22

Increasing

 

 

Fairchild

10-40

Increasing

 

 

Nexperia

13-40

Increasing

SOT23SD/DD from 20 to 45 weeks - SOD523 from 40 weeks - - SOT 89 40 WEEKS - SOT323SD/DD from 40 weeks SOT363 from 30 to 40 weeks SOT353P 20-40 WEEKS SOD123F 30 WEEKS DHVQFN14/16/20/24 from 12 to 24 weeks – DFN PACKAGES 20 weeks – SOD 323 26 WEEKS – SOT 223 40 WEEKS – DSN PACKAFES 20 WEEKS

 

ON Semiconductor

12-40

Increasing

SMA 23-40 WEEKS – SMB 23-40 WEEKS – SMC 28-33 WEEKS – SOT 23 COPPER 20-45 WEEKS – SOT 89 16-30 WEEKS – SOT223 40 WEEKS – TO220 16-22 WEEKS – SOD 923 18-22 WEEKS – SOIC-8-14-16 20-30 WEEKS – SOD123 COPPER 20-30 WEEKS – SOD 323 DPAK 20-30 WEEKS – DFN PACK 20-52 WEEKS – SC 70 18-30 WEEKS

 

Rohm Semiconductor

10-60

Increasing

The following packages have been extended to 40 weeks CPT - TSMT356 - TSMT36M - TSMT8 - TSMT8M - SOP8 - UMD2M - USM - EMD2M - EMD2 - TUSH/TUMD2S - PMDU - PMDUM – PSM – PMDS - SSOP5 - SSOP6

 

PASSIVES

 

Trimmers & Pots

BI Tech

8-12

Stable

 

 

Piher

10-14

Stable

 

 

Panasonic

14-16

Decreasing

Pots will be EOL by the end of 2017

 

Vishay

10-14

Stable

 

 

Electrolytic

NIC Components

18-20

Increasing

Leadtimes pushed out. Some pricing has been increased. Pushouts some cases 40 weeks

 

Nichion

18-28

Stable

SMD 10x10,8x10,6.3x7.7 Leadtimes coming down now between 18-24, Snap-in still 28-30, price increases happening

 

Surge

14-19

Increasing

Lead-times pushing out closing on 20 weeks on some products

 

Panasonic

14-18

Decreasing

Some SMD dropping from 18 to 16 weeks. Some price increases.

 

United Chemicon

16-20

Increasing

Leadtimes increasing the 18-20 weeks

 

Capacitors - Tantalum

AVX

20-28

Increasing

Long lead-times across all case sizes

 

Vishay

15-20

Increasing

Lead-times extending on small case sizes A & B

 

Leaded Capacitors - Ceramic

AVX

18-20

Stable

 

 

Murata

18-20

Stable

A lot of parts EOL'd

 

Vishay

12-16

Stable

 

 

NIC Components

14-18

Increasing

 

 

TDK

14-20

Increasing

 

 

Surface Mount General Capacitors – Ceramic

AVX

24+

Increasing

Automotive Specs Sold Out, Allocation on 44 series of parts. Controlled order entry on long list of parts

 

Murata

20-38+

Increasing

Controlled order entry on a long list of parts, mostly large case sizes. EOL notification on many parts

 

Samsung

24+

Increasing

Lead times under pressure, price increases in Q1 2018

 

TDK

24+

Increasing

On severe allocation

 

Taiyo Yuden

30+

Increasing

On severe allocation

 

NIC Components

24+

Increasing

 

 

Yageo

38+

Increasing

Price increase in Q1 2018, Controlled order entry on long list of parts

 

Walsin

40+

Increasing

 

 

Vishay

16+

Stable

 

 


Contact us

Tel: (86) 769 8118 8110
Tel: (852) 8106 7033
Fax: (852) 8106 7099
E-mail: info@kingtronics.com
Skype: kingtronics.sales
MSN: kingtronics-sales@hotmail.com
Web: www.Kingtronics.com
YouTube: www.youtube.com/c/Kingtronicskt

About

Kingtronics International Company was established in 1995 located in Dongguan City of China to handle all sales & marketing for factories located in Chengdu, Sichuan and Zhaoqing, Guangdong, China. In 1990, we established the first factory to produce trimming potentiometer and in 1999 we built up new factory in Zhao Qing, Guangdong. Now with around 850 workers, Kingtronics produce trimming potentiometers, dipped tantalum capacitors, multilayer ceramic capacitors, and diode & bridge rectifier. We sell good quality under our brand Kingtronics, and Kt, King, Kingtronics are our three trademarks. All our products are RoHS compliant, and our bridge rectifier have UL approval. Please visit our Products page, you could please download all our PDF datasheet and find cross reference for our Trimming Potentiometer and capacitors.

Tantalum and Ceramic Capacitors Cross Reference ↓ Download
Diodes & Rectifiers List(PDF: 97KB) ↓ Download
Trimming Potentiometer Cross Reference ↓Download

Archives

Calendar

<< 2024-3 >>

Sun

Mon

Tue

Wed

Thu

Fri

Sat

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31